F.A.Q
1: What is Power Bi?
A Business intelligence software best known for its interactive visualization features.
2: What is the use of Power Bi in Project Industry?
Automation of project management data and interactive report & dashboards
3: Who can use Power Bi report?
All key stakeholders of the project, Planning engineers, cost controls engineers, project control manager, Project manager, construction manager, project engineer site engineers.
4: Can I use Power BI reports in my project?
Yes
5: How I can use Power Bi reports in my project?
With our project controls templates, you will be able to integrate your project data with Power BI
6: What is the use of this template reports?
The template is designed for project monitoring & controlling, by using earned value management technique
7: Can I use these reports without CPI data?
Yes, if you have actual cost, quantity, and manhours available in P6, then you will be able to perform complete EV analysis of your project including CPI, EAC, ETC, CV, VAC & TCPI.
8: If CPI data is not available then what is the significance of these reports?
Still you can use these reports and dashboards for SPI, EV, SV, PV & BAC
9: How many projects I can apply in this template?
Unlimited projects.
10: What type of construction projects can be integrated with this template?
All type of projects, Building, Infrastructure & roads, EPC, Industrial, residential commercial, oil & gas etc.
11: What are the prerequisites before I use this template?
Your schedule should be made on Primavera P6 (any version) and resources should be loaded
12: Any recommendations before using this template?
For optimum use of the reports and dashboards, resource should be loaded and activity codes to be assigned as many as possible.